[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"person:ontario:hydro-one-brampton-networks-inc:aldo-mastrofrances":3,"person-emp:ontario:hydro-one-brampton-networks-inc":28},[4,18],{"id":5,"year":6,"firstName":7,"lastName":8,"fullName":9,"position":10,"employer":11,"employerSlug":12,"sector":13,"salary":14,"benefits":15,"total":16,"province":17},"ontario-2014-22645",2014,"Aldo","Mastrofrances","Aldo Mastrofrances","Vice President Of Engineering And Operations","Hydro One Brampton Networks Inc.","hydro-one-brampton-networks-inc","Hydro One and Ontario Power Generation",138653.27,580.38,139233.65,"ontario",{"id":19,"year":20,"firstName":21,"lastName":22,"fullName":23,"position":24,"employer":11,"employerSlug":12,"sector":13,"salary":25,"benefits":26,"total":27,"province":17},"ontario-2013-32056",2013,"ALDO","MASTROFRANCES","ALDO MASTROFRANCES","Vice President Engineering And Operations",134201.6,6303.72,140505.32,{"name":11,"sector":13,"employeeCount":29,"totalPaid":30,"avgSalary":31,"topSalary":32},70,8899306.64,127132.952,259429.77]